Today not alot of detailing was done. Another 8' section of "temp" retaining wall was set and leveled and some minor filling with dirt was done. With any luck, and the rain holds off by Sat: i should have that section filled with dirt. This area will support the feed mill and Grain Bins. I plan on the feed mill being a Big Industry with Large Grain Bins.