Saturday, May 2, 2009
5.02.09
Rain still pouring down today. I didn't get to fill in the new 8' section with dirt. Looks like it may be a few more days til things dry out.
5.01.09
I didn't get any work done today on the RR, "RAIN" all day. I am working up plans for the feed mill, and construction will start on that soon. I want the Feed Mill to be a Large Building serving Rail, Truck and Local pickup for farmers and local live stock producers.
Thursday, April 30, 2009
4.30.09
Today not alot of detailing was done. Another 8' section of "temp" retaining wall was set and leveled and some minor filling with dirt was done. With any luck, and the rain holds off by Sat: i should have that section filled with dirt. This area will support the feed mill and Grain Bins. I plan on the feed mill being a Big Industry with Large Grain Bins.
Wednesday, April 29, 2009
4.29.09
Worked on getting some electric work done today. Run some feeder wires for lights in buildings and other needs as things move along....
Tuesday, April 28, 2009
4.28.09
I put 2 fork lifts and a log loader to work on the yard today. Also got the CP Rail Box Car out in the Garden to carry lumber from the mill.
Monday, April 27, 2009
4.27.09
I got some work done today on the RR. I put up a new fence on Hagan Bros. Mill. A Control Master 20 arrived to power the Dash 9 better. Also a couple of Aristo Craft Switches Arrived.
Subscribe to:
Posts (Atom)
Blog Archive
-
►
2011
(1)
- ► 02/27 - 03/06 (1)
-
▼
2009
(64)
- ► 12/06 - 12/13 (1)
- ► 11/22 - 11/29 (1)
- ► 08/30 - 09/06 (1)
- ► 08/02 - 08/09 (1)
- ► 07/26 - 08/02 (3)
- ► 07/12 - 07/19 (1)
- ► 07/05 - 07/12 (2)
- ► 06/28 - 07/05 (1)
- ► 06/14 - 06/21 (4)
- ► 06/07 - 06/14 (7)
- ► 05/31 - 06/07 (6)
- ► 05/24 - 05/31 (7)
- ► 05/17 - 05/24 (7)
- ► 05/10 - 05/17 (7)
- ► 05/03 - 05/10 (7)